{"id":968,"date":"2018-04-17T10:57:27","date_gmt":"2018-04-17T10:57:27","guid":{"rendered":"https:\/\/pmastudio.com\/guide-to-the-steps-to-build-a-house-in-majorca\/"},"modified":"2018-04-17T10:57:27","modified_gmt":"2018-04-17T10:57:27","slug":"guide-to-the-steps-to-build-a-house-in-majorca","status":"publish","type":"post","link":"https:\/\/pmastudio.com\/en\/guide-to-the-steps-to-build-a-house-in-majorca\/","title":{"rendered":"Guide to the steps to build a house in Majorca"},"content":{"rendered":"<p>Building a house or any type of building is a complex and time-consuming task. Therefore, we have shared with you a guide from the <a href=\"http:\/\/www.coaib.org\/es\/area-tecnica\/novedades-y-noticias.aspx\">Architects Association of the Balearic Islands*<\/a> which explains in detail what are the steps to follow in the design and construction of any building, detailing the role of each agent at each stage of the process.<\/p>\n<h4>COMMISSIONING AND CONSTRUCTION OF A BUILDING<\/h4>\n<p>Before starting any new construction or the renovation and expansion of an existing building, it is necessary to have a <strong>project<\/strong>. This document is essential not only to obtain the <strong>municipal license<\/strong> but also to be able to execute the <strong>work<\/strong>. The <strong>project<\/strong>, in accordance with the <a href=\"https:\/\/www.boe.es\/buscar\/doc.php?id=BOE-A-1999-21567\">Law on Building Management (LOE)<\/a>, must be drafted by a <strong>senior<\/strong> <strong>architect<\/strong> who, with his work and signature, guarantees that it complies with urban planning and technical legality. In addition, the future execution of the <strong>work<\/strong> will also comply with current safety and habitability regulations.<\/p>\n<h4>THE TECHNICIANS INVOLVED IN THE PROJECT AND THE CONSTRUCTION SITE<\/h4>\n<p>In order to <strong>construct, renovate or extend a building<\/strong>, in addition to hiring the services of an <strong>architect<\/strong>, the following technicians must also be involved, depending on the type of work:<br \/>\n1.- An <strong>architect<\/strong> to draw up the project and also to be the <strong>construction manager<\/strong>. Both functions are usually performed by the same architect.<\/p>\n<p>2.- A <strong>technical architect<\/strong> or <strong>quantity surveyor<\/strong> who, in addition to being the <strong>director of the execution of the work<\/strong>, will draw up the <strong>materials control plan<\/strong>.<\/p>\n<p>3.- An <strong>architect or a technical architect or quantity surveyor<\/strong> to draw up a <strong>basic health and safety<\/strong> study or <strong>study<\/strong> and, during the execution of the works, to carry out its coordination. The architect may be hired to draft the aforementioned health and safety study and also to be its coordinator during the works.<\/p>\n<p>4.- If the building has more than one dwelling or has different uses, a <strong>telecommunications engineer<\/strong> must be hired to draw up and direct the so-called common telecommunications infrastructure project.<\/p>\n<p>5.- If the building foresees the construction of premises for a specific activity, an engineer or <strong>architect<\/strong> must also be hired to draw up an <strong>activity project<\/strong>.<\/p>\n<h4>THE ENGAGEMENT OF THE SERVICES OF AN ARCHITECT<\/h4>\n<p>When deciding to <strong>construct, renovate or extend a building<\/strong>, the <strong>developer<\/strong> or <strong>owner<\/strong> should, in the first instance, contact a registered <strong>architect<\/strong>. Explain your intentions, the economic possibilities available to you, provide you with a plan of the location and the characteristics of the site to be constructed or the building to be renovated or enlarged and explain the program of requirements of the <strong>project<\/strong> to be drafted.<br \/>\nThen, the <strong>architect<\/strong>, in view of the legal, urban, technical and physical constraints, will be able to guide you on how the future building could look like and its estimated cost.<br \/>\nGenerally, this change of impressions will be sufficient for the developer or owner to make the decision to hire the services of the <strong>architect<\/strong> and for the architect to begin drafting the building <strong>project<\/strong>. However, if, due to the complexity of the building program, the work or any other circumstance, more information is required, it may be requested by formalizing the commissioning of a preliminary study or a <strong>preliminary project<\/strong>. The cost of these plans and documents is much lower than the cost of the project and can help you decide.<br \/>\nThe hiring of any architect is supervised by the <a href=\"http:\/\/www.coaib.org\/es.aspx\">Col\u2219legi Oficial d&#8217;Arquitectes de les Illes Balears (COAIB)<\/a> which guarantees that the <strong>architect<\/strong> has an official title and meets the legal conditions for professional practice. This contract is materialized by means of a private document to be signed by the developer or owner and the architect. Said&nbsp; document will serve as a guarantee of compliance with what has been agreed upon by the parties and will also establish the specific contractual conditions for each <strong>project<\/strong> and for the <strong>management of the works<\/strong>.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-353\" src=\"https:\/\/www.pmastudio.com\/wp-content\/uploads\/2015\/12\/5.Tranparencia-Decoracion-PMA-Studio-Arquitecto-Estudio-Arquitectura-Palma-Mallorca-urbanismo-project-management-Architect-tecnico-800x600.jpg\" alt=\"5.Tranparency-Decoration-PMA-Studio-Architect-Studio-Architecture-Palma-Mallorca-urban-planning-project-management-Architect-technical\" width=\"800\" height=\"600\"><\/p>\n<h4>THE ARCHITECTURAL PROJECT<\/h4>\n<p>The <strong>project<\/strong>, drafted by the senior <strong>architect<\/strong>, is the document that resolves in graphic and written form the program of the building in accordance with the needs set forth by the <strong>developer<\/strong> or <strong>owner<\/strong>. To this end, the legal, urban planning and technical regulations that guarantee the quality of the building and its surroundings have been taken into account.<br \/>\nHowever, the project is not only a technical document, but also involves artistic and cultural aspects of great importance that, thanks to the complex and lengthy university and post-university training he has received, only an <strong>architect<\/strong> is capable of capturing.<br \/>\nThe documentation that makes up a <strong>project<\/strong> must, in addition to complying with certain formal requirements, be sufficient to be able to execute the work. The <a href=\"http:\/\/www.coaib.org\/es.aspx\">Col\u2219legi Oficial d&#8217;Arquitectes<\/a>, by means of the <strong>visa<\/strong>, controls compliance with the &#8220;minimum standards of presentation&#8221;, verifies that the <strong>project<\/strong> is complete and that it is sufficient to allow the <strong>direction of the execution of the work<\/strong> and the intervention of other professionals. A project consists of the following parts:<\/p>\n<h5>1.- Basic project<\/h5>\n<p>It contains the plans with the design and architectural composition of the building, as well as the documents related to the fulfillment of the urban and habitability conditions. This document is sufficient for the application and granting of the <strong>municipal building permit<\/strong>, although it is not sufficient for the commencement and execution of the <strong>work<\/strong>.<br \/>\nThe architect for the drafting of the basic project, depending on the complexity of the site or the plot where it is intended to build, may require additional technical information such as, for example, a <strong>topographic study<\/strong>. The topographic plan consists of the determination of the location, orientation, surface, ground levels, access roads, easements, existing trees, walls or enclosure walls, etc. of the site. Generally, the <strong>topographic study<\/strong> is provided or contracted, independently of the <strong>architect<\/strong>, by the developer or the owner to a topographic technician. When a building already exists on the site where it is to be built, the architect will also require complete plans of its current state.<\/p>\n<h5>2.- Execution project<\/h5>\n<p>This <strong>project<\/strong> develops the <strong>basic project<\/strong> and, in addition, completes it technically with the construction drawings. These determine the type of foundation and structure of the building, as well as its calculation, the installations (sewage disposal, plumbing, electricity, heating, air conditioning, etc.), the technical specifications, the state of measurements and the budget.<br \/>\nof the work.<br \/>\nFor the drafting of the <strong>execution project<\/strong>, in accordance with current regulations, a <strong>geotechnical study<\/strong> of the site where the building is to be built must be carried out by the <strong>developer<\/strong> or the <strong>owner<\/strong> by a company specialized in geotechnical engineering. This company shall, depending on the characteristics of the subsoil and the project, carry out the tests, trials and laboratory analyses required by the architect for the design and calculation of the foundation and structure of the building.<\/p>\n<h4>THE HEALTH AND SAFETY STUDY<\/h4>\n<p>The  <strong>study or the basic health and safety study<\/strong>shall be drafted by a  <strong>architect<\/strong>  or a  <strong>technical architect<\/strong>appointed by the  <strong>promoter<\/strong>  or the  <strong>owner<\/strong>Its purpose, in accordance with the law, is to identify the health and safety risks that may arise from the project during the execution of the work and to establish the technical and preventive measures to avoid them.<br \/>\nWhen the work involves the intervention of more than one company, subcontracted companies or self-employed persons, the promoter or owner must hire an architect or technical architect as <strong>health and safety coordinator<\/strong>.<\/p>\n<h4>THE MATERIALS QUALITY CONTROL PROGRAM<\/h4>\n<p>The program of  <strong>quality control of materials<\/strong>  is a document drafted by the  <strong>technical architect<\/strong>  or the  <strong>construction surveyor<\/strong>  in which, according to the  <strong>implementation project<\/strong>The materials to be controlled during the execution of the project are specified.  <strong>work<\/strong>as well as testing, sampling, acceptance criteria, etc.<br \/>\nCurrent regulations require that at least the concrete, the steel used in the reinforcement, the prefabricated joists, the concrete or ceramic blocks and the waterproofing of the roof be inspected.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-367\" src=\"https:\/\/www.pmastudio.com\/wp-content\/uploads\/2015\/12\/7.Transparencia-Cedulas-Habitabiliad-Actividades-Turisticas-PMA-Studio-Arquitecto-Estudio-Arquitectura-Palma-Mallorca-urbanismo-project-management-Architect-tecnico-800x600.jpg\" alt=\"7.Transparency-Cedules-Habitability-Activities-Tourism-PMA-Studio-Architecture-Studio-Architecture-Palma-Mallorca-urbanism-project-management-Architect-technical\" width=\"800\" height=\"600\"><\/p>\n<h4>PROCESSING AT PROFESSIONAL ASSOCIATIONS<\/h4>\n<p>The <strong>project<\/strong> drafted by the <strong>architect<\/strong> requires, for its complete and effective validity, the visa by the <a href=\"http:\/\/www.coaib.org\/es.aspx\">Col\u2219legi Oficial d&#8217;Arquitectes de les Illes Balears<\/a>.<\/p>\n<h4>THE MUNICIPAL BUILDING PERMIT<\/h4>\n<p>The municipal building <strong>permit<\/strong> is granted by the City Council after verifying that the project drafted by the architect complies with the town planning regulations of the municipality and complies with the technical and habitability standards in force.<br \/>\nThe basic project is a sufficient document for the application and granting of the municipal building <strong>permit<\/strong>, although it is not sufficient to start the works. For this purpose, in addition to the municipal <strong>license<\/strong>, the City Council must have authorized, expressly or tacitly, its commencement once the developer or owner has submitted the following documents:<\/p>\n<p>1.- The <strong>basic project<\/strong> and the <strong>execution project<\/strong>.<\/p>\n<p>2.- The <strong>basic health and safety<\/strong> study or <strong>study<\/strong>.<\/p>\n<p>3.- The notification of the appointment of the <strong>facultative direction<\/strong>: The <strong>architect<\/strong> director of the work and the <strong>technical architect<\/strong> director of the execution of the work.<\/p>\n<p>4.- The designation of the <strong>construction company<\/strong>.<\/p>\n<p>5.- When a <strong>license<\/strong> is requested for a building with more than one dwelling, a<strong> telecommunications<\/strong> project and the designation of the technical director must be submitted together with the execution project.<\/p>\n<h4>THE CONTRACTING OF THE CONSTRUCTION COMPANY<\/h4>\n<p>The <strong>developer<\/strong> or the <strong>owner<\/strong>, once the <strong>execution project<\/strong> has been drafted, can request estimates from different construction companies, as well as, if applicable, from the<br \/>\ntelecommunications.<br \/>\nThe contracting will be formalized by means of a so-called <strong>works contract<\/strong> to be signed exclusively between the property and the company or companies awarded the contract. With the exception of the document containing the detailed budget, it must not contain any clauses that modify the project requirements. Generally, possible variations in this budget are usually due to the market situation and to modifications before or during the execution of the work.<br \/>\nDepending on the preferences and the economic offer, one of the following systems can be chosen to formalize the contract for&nbsp;work: &#8220;closed budget&#8221;, &#8220;by administration&#8221; or &#8220;by work units&#8221;.<\/p>\n<h4>TAKING OUT TEN-YEAR DAMAGE INSURANCE<\/h4>\n<p>The <a href=\"https:\/\/www.boe.es\/buscar\/doc.php?id=BOE-A-1999-21567\">Building Management Law (LOE)<\/a> establishes the obligation for the <strong>promoter<\/strong> to contract, prior to&nbsp;the start of construction, a <strong>ten-year insurance policy<\/strong> for material damages caused by construction defects. This insurance is required for all residential buildings, except when it is a single dwelling on the site for the developer&#8217;s own use, and constitutes a ten-year guarantee for the compensation of material damage caused by faults or defects that directly compromise the mechanical resistance and stability of the building, provided that they originate in or affect the foundations and\/or structure.<\/p>\n<p>The underwriting by the <strong>developer<\/strong> of the ten-year insurance policy with an insurance company requires the prior contracting of a <strong>technical control<\/strong> body <strong>(OCT)<\/strong> to carry out, during the design and execution of the work, the risk assessment <strong>reports<\/strong> on the foundation and structure. The <strong>technical control<\/strong> bodies are auxiliary entities, at the service of the insurance companies, which must draw up the risk assessment <strong>reports<\/strong> for the project and the work.<\/p>\n<p>In order to assess these risks, the technical control bodies require the execution project and the&nbsp;<strong>geotechnical study<\/strong> of the soil. They then issue a report called <strong>D01<\/strong> which evaluates the risk based on the physical and geological characteristics of the site, the location of the building, the foundation, the type of structure chosen and its calculation.<br \/>\nThe insurance company is the one that, in the end, estimates the value of the ten-year damage insurance, generally based on the quality of the building, the modifications made during its construction and the reports of the <strong>technical control<\/strong> body <strong>(OCT)<\/strong> that has been contracted.<br \/>\nThe developer or the owner is the one who must subscribe the<strong> ten-year damage insurance (SDD)<\/strong> with the insurance company and contract, with the agreement of the <strong>architect<\/strong>, the services of the <strong>technical control body (OCT)<\/strong>. The justification of the contracting of such insurance will be necessary in order to be able to register the work in the <strong>Land Registry<\/strong>.<\/p>\n<h4>THE START OF THE WORK<\/h4>\n<p>Once the  municipal building <strong>permit<\/strong>, to have contracted the construction agency, to have  <strong>technical control<\/strong> and have the document  <strong>D01<\/strong> issued by the  <strong>OCT<\/strong> in a favorable sense, have subscribed to the  <strong>ten-year damage insurance,<\/strong> having obtained the authorization to start the works from the municipality and having hired the technicians who will manage the works (<strong>architect and technical architect or quantity surveyor<\/strong>),  <strong>the safety and health coordinator and the contractor<\/strong>, the  <strong>promoter<\/strong> or the  The <strong>owner<\/strong> is already in a position to start the work, although it should not begin until:<\/p>\n<p>1.- To sign the <strong>staking out report<\/strong> that certifies the starting date of the work, that it has all the necessary documents for its beginning and that it is possible to build the project drafted within the real limits of the plot of land.<\/p>\n<p>2.- The <strong>builder<\/strong> has signed the <strong>book of orders and assistances<\/strong>, document of the facultative direction where this one writes down the orders that are given during the execution of the work.<\/p>\n<p>3.- The <strong>safety and health coordinator<\/strong> has approved the <strong>safety plan<\/strong>. Document to be drafted by the constructor based on the health and safety study.<\/p>\n<p>4.- Likewise, the<strong>  health and safety coordinator<\/strong>  must have provided the  <strong>logbook<\/strong>  to be used for monitoring and control of the  <strong>security plan<\/strong>  and in which the incidences in this matter that may occur during the  <strong>execution of the work<\/strong>.<\/p>\n<p>5.- Finally, the <strong>builder<\/strong> must inform the competent labor authority (Conselleria de Treball, Comer\u00e7 i Ind\u00fastria) of the opening of the work site.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-363\" src=\"https:\/\/www.pmastudio.com\/wp-content\/uploads\/2015\/12\/4.Tranparente-Project-Manager-PMA-Studio-Arquitecto-Estudio-Arquitectura-Palma-Mallorca-urbanismo-project-management-Architect-tecnico-800x600.jpg\" alt=\"4.Tranparente-Project-Manager-PMA-Studio-Arquitecto-Estudio-Arquitectura-Palma-Mallorca-urbanismo-project-management-Architect-tecnico\" width=\"800\" height=\"600\"><\/p>\n<h4>THE OPTIONAL MANAGEMENT<\/h4>\n<p>The <strong>facultative direction<\/strong> is constituted by the <strong>architect<\/strong> as <strong>director of the work<\/strong> and the <strong>technical architect<\/strong> as <strong>director of the execution of the work<\/strong>. Both have specific and complementary tasks to perform in close collaboration during the course of the work. They must comply with the content of the project that has been awarded the  <strong>license<\/strong>The architectural and technical sense, which is the specific task of the architect, as well as the organization of the execution of the works, the quality of the materials used and the compliance with its determinations, which is the specific task of the architect.  <strong>technical architect or quantity surveyor<\/strong>. To this end, the <strong>optional direction<\/strong> will dictate, verbally or will write them down in the order book, the opportune instructions. This book must be endorsed by the <a href=\"http:\/\/www.coaib.org\/es.aspx\">Col\u2219legi Oficial d&#8217;Arquitectes<\/a> and kept permanently on site.<br \/>\nAlthough it is legally possible to entrust the project <strong>management<\/strong> of a work to an <strong>architect<\/strong> other than the one who drafted the <strong>project<\/strong>, it is advisable that both functions be assumed by the same technician, since it is a question of carrying out two different phases within a single creative process.<\/p>\n<h4>EXECUTION AND COMPLETION OF THE WORK<\/h4>\n<p>Generally, during the <strong>execution of the work<\/strong>, partial economic settlements must be made by means of <strong>work certifications<\/strong>. These are usually performed monthly or by complete phases of the work and are based on an actual measurement of the work executed and on an appraisal of such measurement by the <strong>technical architect or quantity surveyor<\/strong>, taking into account the economic conditions agreed in the construction contract.<br \/>\nDuring the  <strong>execution of the work<\/strong>the architect  <strong>technician or quantity surveyor<\/strong>  must supervise the correct execution of the  <strong>quality control<\/strong>  of the materials and collect all the  <strong>certificates<\/strong>tests and controls on the materials to be tested, i.e. concrete, reinforcing steel, joists, masonry (concrete or ceramic blocks) and waterproofing of the roof. The  <strong>architect and technical architect<\/strong>Once the work is completed, they will proceed to issue the  <strong>final certificate of&nbsp;work and habitability<\/strong>  that accredits the total completion of the projected works, as well as that the building is, except for hidden defects, in perfect conditions to be used and serves the purpose for which it was projected. This certificate is accompanied by the documentation that proves the correct execution of the quality control plan for the materials.<br \/>\nThe <strong>instructions for use and maintenance of the building<\/strong> must be attached to the <strong>final certificate of construction and habitability<\/strong>. This document is drafted by the <strong>project management<\/strong> and contains the technical specifications of the constructed work, the applicable regulations, the criteria for use, revisions, pathology forecasts and general maintenance of the building. The <strong>final certificate of work and habitability<\/strong> must, for its validity and effects, be endorsed by the <a href=\"http:\/\/www.coaib.org\/es.aspx\">Col\u2219legi Oficial d&#8217;Arquitectes<\/a> and\/or by the <a href=\"http:\/\/www.coaatmca.com\/\">Colegio de Arquitectos T\u00e9cnicos y Aparejadores (Association<\/a> <a href=\"http:\/\/www.coaib.org\/es.aspx\">of<\/a> <a href=\"http:\/\/www.coaatmca.com\/\">Technical Architects and Quantity Surveyors<\/a>).<br \/>\nIn this final phase of the construction work, the <strong>signing of the acceptance certificate<\/strong> will also take place, which consists of the written accreditation of the &#8220;act&#8221; by which the builder, once the work has been completed, delivers it to the promoter or owner and is accepted by the latter.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-358\" src=\"https:\/\/www.pmastudio.com\/wp-content\/uploads\/2015\/12\/3.Tranparente-Asesoramiento-PMA-Studio-Arquitecto-Estudio-Arquitectura-Palma-Mallorca-urbanismo-project-management-Architect-tecnico-800x600.jpg\" alt=\"3.Tranparent-Advice-PMA-Studio-Architecture-Studio-Architecture-Palma-Mallorca-urbanism-project-management-Architect-technical\" width=\"800\" height=\"600\"><\/p>\n<h4>THE FINAL STEPS<\/h4>\n<p>When the building is completed and prior to occupancy, acceptance of the building by official bodies is required. For this purpose, the <strong>developer<\/strong> or the <strong>owner<\/strong> must request from the <strong>City Council<\/strong> the <strong>municipal report of completion of the work<\/strong>, attaching to the request the <strong>final certificate of work and habitability<\/strong>.<\/p>\n<p>Once this is obtained, it will be possible to apply to the <strong>Consell Insular<\/strong> for the <strong>certificate of habitability<\/strong> and with it to definitively contract with the companies the water, gas, electricity, telephone, etc. <strong>supply<\/strong>. In order to process the <strong>certificate of habitability<\/strong>, the following documents, among others, must be submitted to the Consell Insular:<\/p>\n<p>1.- The <strong>final certificate of construction and habitability<\/strong>.<\/p>\n<p>2.- The <strong>municipal building permit<\/strong>.<\/p>\n<p>3.- The <strong>municipal report of completion of works<\/strong>.<\/p>\n<p>4.- A<strong> site plan and a photograph of the building<\/strong>, signed by the architect or by the architect.<br \/>\ntechnical expert of the work.<\/p>\n<p>The <strong>developer<\/strong> or <strong>owner<\/strong> must also process the deed <strong>of new construction<\/strong> and, if applicable, the deed of division&nbsp;horizontal. These documents are drawn up by the <strong>notary<\/strong> and contain the <strong>description of the property<\/strong> for its subsequent registration in the <strong>Land Registry<\/strong>. The following documents, among others, must be provided in order to process the new construction deed:<\/p>\n<p>1.- The <strong>final certificate of construction and habitability<\/strong>.<\/p>\n<p>2.- The <strong>municipal building permit<\/strong>.<\/p>\n<p>3.- The<strong> municipal report of completion of works<\/strong>.<\/p>\n<p>4.- The<strong> ten-year guarantee or surety insurance contract<\/strong>.<\/p>\n<p>Finally, the <strong>owner<\/strong> or <strong>developer<\/strong>, upon presentation of the deed of <strong>new construction<\/strong> and, when applicable, of the deed of horizontal division, may register the building in the Cadastre.<\/p>\n<p>*The above text is an explanatory text extracted from the <a href=\"http:\/\/www.coaib.org\/es.aspx\">COAIB<\/a> (Association of Architects of the Balearic Islands).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Building a house or any type of building is a complex and time-consuming task. Therefore, we have shared with you a guide from the Architects Association of the Balearic Islands* which explains in detail what are the steps to follow in the design and construction of any building, detailing the role of each agent at [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":787,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[26],"tags":[],"class_list":["post-968","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Guide to the steps to build a house in Majorca - PMA STUDIO<\/title>\n<meta name=\"description\" content=\"{:es}Guide to all the steps involved in the design and construction process of a house in Mallorca. Counting with all the agents and organizations involved in the process: City Hall, Architect, Quantity Surveyors, Construction Company, Clients and others. {:}\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pmastudio.com\/en\/guide-to-the-steps-to-build-a-house-in-majorca\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guide to the steps to build a house in Majorca - PMA STUDIO\" \/>\n<meta property=\"og:description\" content=\"{:es}Guide to all the steps involved in the design and construction process of a house in Mallorca. Counting with all the agents and organizations involved in the process: City Hall, Architect, Quantity Surveyors, Construction Company, Clients and others. {:}\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pmastudio.com\/en\/guide-to-the-steps-to-build-a-house-in-majorca\/\" \/>\n<meta property=\"og:site_name\" content=\"PMA STUDIO\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pmastudiocom\" \/>\n<meta property=\"article:published_time\" content=\"2018-04-17T10:57:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pmastudio.com\/wp-content\/uploads\/2018\/04\/anders-nord-9rEmum-2_yY-unsplash-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1833\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"artifices\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"artifices\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/guide-to-the-steps-to-build-a-house-in-majorca\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/guide-to-the-steps-to-build-a-house-in-majorca\\\/\"},\"author\":{\"name\":\"artifices\",\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/#\\\/schema\\\/person\\\/1c5c3e08fdbeb69817d9db6742f50bfc\"},\"headline\":\"Guide to the steps to build a house in Majorca\",\"datePublished\":\"2018-04-17T10:57:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/guide-to-the-steps-to-build-a-house-in-majorca\\\/\"},\"wordCount\":3104,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/guide-to-the-steps-to-build-a-house-in-majorca\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/pmastudio.com\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/anders-nord-9rEmum-2_yY-unsplash-scaled.jpg\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/pmastudio.com\\\/en\\\/guide-to-the-steps-to-build-a-house-in-majorca\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/guide-to-the-steps-to-build-a-house-in-majorca\\\/\",\"url\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/guide-to-the-steps-to-build-a-house-in-majorca\\\/\",\"name\":\"Guide to the steps to build a house in Majorca - PMA STUDIO\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/guide-to-the-steps-to-build-a-house-in-majorca\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/guide-to-the-steps-to-build-a-house-in-majorca\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/pmastudio.com\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/anders-nord-9rEmum-2_yY-unsplash-scaled.jpg\",\"datePublished\":\"2018-04-17T10:57:27+00:00\",\"description\":\"{:es}Guide to all the steps involved in the design and construction process of a house in Mallorca. Counting with all the agents and organizations involved in the process: City Hall, Architect, Quantity Surveyors, Construction Company, Clients and others. {:}\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/guide-to-the-steps-to-build-a-house-in-majorca\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/pmastudio.com\\\/en\\\/guide-to-the-steps-to-build-a-house-in-majorca\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/guide-to-the-steps-to-build-a-house-in-majorca\\\/#primaryimage\",\"url\":\"https:\\\/\\\/pmastudio.com\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/anders-nord-9rEmum-2_yY-unsplash-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/pmastudio.com\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/anders-nord-9rEmum-2_yY-unsplash-scaled.jpg\",\"width\":2560,\"height\":1833},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/guide-to-the-steps-to-build-a-house-in-majorca\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/pms-studio-architecture\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Guide to the steps to build a house in Majorca\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/\",\"name\":\"PMA STUDIO\",\"description\":\"Architecture &amp; Project Management\",\"publisher\":{\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/#organization\",\"name\":\"PMA STUDIO\",\"url\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/pmastudio.com\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/logo-rectangular-claim.svg\",\"contentUrl\":\"https:\\\/\\\/pmastudio.com\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/logo-rectangular-claim.svg\",\"width\":173,\"height\":107,\"caption\":\"PMA STUDIO\"},\"image\":{\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/pmastudiocom\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/pma-studio\\\/\",\"https:\\\/\\\/www.instagram.com\\\/pmastudiocom\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/#\\\/schema\\\/person\\\/1c5c3e08fdbeb69817d9db6742f50bfc\",\"name\":\"artifices\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b84d50380e1e0101c48e124a9d333444320c7316210968ecc266485babbf4b0b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b84d50380e1e0101c48e124a9d333444320c7316210968ecc266485babbf4b0b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b84d50380e1e0101c48e124a9d333444320c7316210968ecc266485babbf4b0b?s=96&d=mm&r=g\",\"caption\":\"artifices\"},\"sameAs\":[\"https:\\\/\\\/pmastudio.com\"],\"url\":\"https:\\\/\\\/pmastudio.com\\\/en\\\/author\\\/artifices\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Guide to the steps to build a house in Majorca - PMA STUDIO","description":"{:es}Guide to all the steps involved in the design and construction process of a house in Mallorca. Counting with all the agents and organizations involved in the process: City Hall, Architect, Quantity Surveyors, Construction Company, Clients and others. {:}","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pmastudio.com\/en\/guide-to-the-steps-to-build-a-house-in-majorca\/","og_locale":"en_US","og_type":"article","og_title":"Guide to the steps to build a house in Majorca - PMA STUDIO","og_description":"{:es}Guide to all the steps involved in the design and construction process of a house in Mallorca. Counting with all the agents and organizations involved in the process: City Hall, Architect, Quantity Surveyors, Construction Company, Clients and others. {:}","og_url":"https:\/\/pmastudio.com\/en\/guide-to-the-steps-to-build-a-house-in-majorca\/","og_site_name":"PMA STUDIO","article_publisher":"https:\/\/www.facebook.com\/pmastudiocom","article_published_time":"2018-04-17T10:57:27+00:00","og_image":[{"width":2560,"height":1833,"url":"https:\/\/pmastudio.com\/wp-content\/uploads\/2018\/04\/anders-nord-9rEmum-2_yY-unsplash-scaled.jpg","type":"image\/jpeg"}],"author":"artifices","twitter_card":"summary_large_image","twitter_misc":{"Written by":"artifices","Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pmastudio.com\/en\/guide-to-the-steps-to-build-a-house-in-majorca\/#article","isPartOf":{"@id":"https:\/\/pmastudio.com\/en\/guide-to-the-steps-to-build-a-house-in-majorca\/"},"author":{"name":"artifices","@id":"https:\/\/pmastudio.com\/en\/#\/schema\/person\/1c5c3e08fdbeb69817d9db6742f50bfc"},"headline":"Guide to the steps to build a house in Majorca","datePublished":"2018-04-17T10:57:27+00:00","mainEntityOfPage":{"@id":"https:\/\/pmastudio.com\/en\/guide-to-the-steps-to-build-a-house-in-majorca\/"},"wordCount":3104,"commentCount":0,"publisher":{"@id":"https:\/\/pmastudio.com\/en\/#organization"},"image":{"@id":"https:\/\/pmastudio.com\/en\/guide-to-the-steps-to-build-a-house-in-majorca\/#primaryimage"},"thumbnailUrl":"https:\/\/pmastudio.com\/wp-content\/uploads\/2018\/04\/anders-nord-9rEmum-2_yY-unsplash-scaled.jpg","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/pmastudio.com\/en\/guide-to-the-steps-to-build-a-house-in-majorca\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/pmastudio.com\/en\/guide-to-the-steps-to-build-a-house-in-majorca\/","url":"https:\/\/pmastudio.com\/en\/guide-to-the-steps-to-build-a-house-in-majorca\/","name":"Guide to the steps to build a house in Majorca - PMA STUDIO","isPartOf":{"@id":"https:\/\/pmastudio.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pmastudio.com\/en\/guide-to-the-steps-to-build-a-house-in-majorca\/#primaryimage"},"image":{"@id":"https:\/\/pmastudio.com\/en\/guide-to-the-steps-to-build-a-house-in-majorca\/#primaryimage"},"thumbnailUrl":"https:\/\/pmastudio.com\/wp-content\/uploads\/2018\/04\/anders-nord-9rEmum-2_yY-unsplash-scaled.jpg","datePublished":"2018-04-17T10:57:27+00:00","description":"{:es}Guide to all the steps involved in the design and construction process of a house in Mallorca. Counting with all the agents and organizations involved in the process: City Hall, Architect, Quantity Surveyors, Construction Company, Clients and others. {:}","breadcrumb":{"@id":"https:\/\/pmastudio.com\/en\/guide-to-the-steps-to-build-a-house-in-majorca\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pmastudio.com\/en\/guide-to-the-steps-to-build-a-house-in-majorca\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pmastudio.com\/en\/guide-to-the-steps-to-build-a-house-in-majorca\/#primaryimage","url":"https:\/\/pmastudio.com\/wp-content\/uploads\/2018\/04\/anders-nord-9rEmum-2_yY-unsplash-scaled.jpg","contentUrl":"https:\/\/pmastudio.com\/wp-content\/uploads\/2018\/04\/anders-nord-9rEmum-2_yY-unsplash-scaled.jpg","width":2560,"height":1833},{"@type":"BreadcrumbList","@id":"https:\/\/pmastudio.com\/en\/guide-to-the-steps-to-build-a-house-in-majorca\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/pmastudio.com\/en\/pms-studio-architecture\/"},{"@type":"ListItem","position":2,"name":"Guide to the steps to build a house in Majorca"}]},{"@type":"WebSite","@id":"https:\/\/pmastudio.com\/en\/#website","url":"https:\/\/pmastudio.com\/en\/","name":"PMA STUDIO","description":"Architecture &amp; Project Management","publisher":{"@id":"https:\/\/pmastudio.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pmastudio.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/pmastudio.com\/en\/#organization","name":"PMA STUDIO","url":"https:\/\/pmastudio.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pmastudio.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/pmastudio.com\/wp-content\/uploads\/2023\/06\/logo-rectangular-claim.svg","contentUrl":"https:\/\/pmastudio.com\/wp-content\/uploads\/2023\/06\/logo-rectangular-claim.svg","width":173,"height":107,"caption":"PMA STUDIO"},"image":{"@id":"https:\/\/pmastudio.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/pmastudiocom","https:\/\/www.linkedin.com\/company\/pma-studio\/","https:\/\/www.instagram.com\/pmastudiocom\/"]},{"@type":"Person","@id":"https:\/\/pmastudio.com\/en\/#\/schema\/person\/1c5c3e08fdbeb69817d9db6742f50bfc","name":"artifices","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/b84d50380e1e0101c48e124a9d333444320c7316210968ecc266485babbf4b0b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b84d50380e1e0101c48e124a9d333444320c7316210968ecc266485babbf4b0b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b84d50380e1e0101c48e124a9d333444320c7316210968ecc266485babbf4b0b?s=96&d=mm&r=g","caption":"artifices"},"sameAs":["https:\/\/pmastudio.com"],"url":"https:\/\/pmastudio.com\/en\/author\/artifices\/"}]}},"_links":{"self":[{"href":"https:\/\/pmastudio.com\/en\/wp-json\/wp\/v2\/posts\/968","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pmastudio.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pmastudio.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pmastudio.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pmastudio.com\/en\/wp-json\/wp\/v2\/comments?post=968"}],"version-history":[{"count":0,"href":"https:\/\/pmastudio.com\/en\/wp-json\/wp\/v2\/posts\/968\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pmastudio.com\/en\/wp-json\/wp\/v2\/media\/787"}],"wp:attachment":[{"href":"https:\/\/pmastudio.com\/en\/wp-json\/wp\/v2\/media?parent=968"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pmastudio.com\/en\/wp-json\/wp\/v2\/categories?post=968"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pmastudio.com\/en\/wp-json\/wp\/v2\/tags?post=968"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}